Use these checklists to prepare for a decision about a contract, facility, shipment, trial, product launch, or insurance renewal. Start with the checklist closest to your next milestone. Add four columns to your working copy: item, owner, due date, and evidence. Record an evidence reference for each answer. An existing operating procedure, a relevant endorsement, or a qualified vendor’s written capability statement is more useful than a tentative “yes.” Share sensitive records only through an approved private channel.
Life sciences insurance readiness
- List legal entities, locations, activities, and key vendor relationships. Mark which entity signs each customer or vendor agreement and which entity owns the equipment, data, inventory, or intellectual property involved.
- Describe your three largest scheduled changes during the next policy period. Include meaningful changes to operations, products, study activity, supply chain, distribution, finance, or geography. Mark the dates when a change becomes effective.
- Make a simple coverage schedule with the responsible carrier or insurer contact, policy period, major limits, deductible or retention, and source document for each point. Track unanswered questions with a renewal owner.
- Pick a representative loss for each important business activity. Estimate the immediate expense, the next two commercial consequences, and the person who would direct the response.
Medical device manufacturer risk review
- Record device families, intended markets, manufacturing responsibilities, and external partners. Specify which entity is responsible for design, assembly, software, labeling, service, and distribution under the business agreements.
- Give quality and regulatory staff ownership of the applicable compliance review. Ask them to identify any meaningful change affecting products, sites, outside vendors, or documentation. Use FDA’s QMSR resources as a primary reference and review applicability for the actual operation.
- Identify insurance questions created by a device issue, software issue, or distribution problem. Review products liability, technology E&O, cyber, and recall on their own terms. Ask which entity and product categories each form identifies.
- Assign owners for post-market communication, obtaining records, and coordinating with distributors in a loss. Check whether the contract allocates cost or control differently from the operating plan.
Clinical trial insurance preparation
- At a business level, identify sponsor, CRO, site, investigator, and third-party service roles. List jurisdictions and operational dates without recording participant names, health data, or confidential protocol details.
- Gather the agreement sections on indemnity, defense, insurance, notice, and claims cooperation. Record who owns the decision to clarify ambiguous wording and who checks whether one agreement supersedes another.
- Ask qualified counsel and study staff to review the participant injury provisions and compliance requirements. Ask your broker to review scope, applicable countries, evidence requirements, limits, dates, and any reporting conditions in the actual coverage.
- Set time aside to check how amendments, site additions, country changes, or extensions are reported to the insurance team.
Laboratory property and equipment
- Inventory essential analyzers, freezers, instruments, building systems, tenant improvements, samples, and consumables. Assign ownership, location, recovery priority, and replacement lead time. Tie those facts to the policy’s valuation method during review.
- Ask which equipment is leased or financed. Read the property and liability insurance conditions separately and identify the requested evidence, named parties, and endorsements.
- Document dependencies on utilities, calibration, vendor service, and backup capacity. If a machine would be replaced before normal service could resume, estimate the individual recovery phases in a business interruption scenario.
- Bring a conditional vendor estimate, a current equipment schedule, and a simple outage timeline to the policy review.
Cold-chain and temperature excursion planning
- Identify where ownership and custody change. Include carrier transfers, third-party storage, temporary stops, and the final acceptance location. Assign an owner to secure the required business records.
- Confirm that quality, operations, and logistics agree on where condition records are kept and who can release a hold or approve disposition. Each team needs its own decision authority.
- Identify which property, spoilage, cargo, and breakdown provisions warrant review. Compare triggers, exclusions, notification requirements, deductibles, valuation, and destinations to the operating plan.
- Estimate the largest concentration of value at a single location or on a single trip. Update the figure before a launch that will change shipment size or staging.
Product recall preparedness
- Map traceability, initial complaint routing, decision authority, customer notification, and insurer notice. Have qualified advisers determine the applicable regulatory obligations and keep the insurance report tied to known facts.
- Break costs into investigation, transport, retrieval, disposal, replacement, customer demands, and business interruption. Ask which expenses each policy treats as eligible under its wording.
- Ask how distributor and manufacturer agreements allocate funding, approval, reporting, and access to records. Record which expenses your company might pay even when another party controls the underlying work.
- Walk through one realistic example and establish how you would preserve cost and activity records if an insurer or counterparty needed them.
CRO and CDMO contract insurance
- Record responsibilities for quality decisions, subcontracting, record access, data, custody, acceptance, and escalation. Resolve differences between the commercial and quality agreement with counsel.
- Review required insurance, limits, endorsement requests, indemnities, and survival terms. Request documentation of the actual forms when appropriate and leave room to negotiate unresolved conditions.
- Confirm what happens when a third-party vendor changes, the project scope expands, or more locations are added. Give one person responsibility for confirming the insurance impact shortly before the change.
Biotech startup and financing readiness
- Write down the business stage, use of funds, target date, buildout and equipment needs, projected liquidity, and the milestone the spending should achieve. Note which plans are contracted and which remain under evaluation.
- List private records your finance, legal, or grant advisers may need. Include budgets, collateral schedules, existing obligations, and company or intellectual-property ownership records. Use your internal secure system to organize these, not a public inquiry.
- Review insurance conditions attached to a lease, loan, servicing arrangement, grant agreement, or investor diligence request. Mark a condition as pending until you have matched the exact requirement to reliable evidence.
- Compare the expected timing of a new funding or product milestone with facility occupancy, equipment commissioning, and policy inception.
Turn the worksheet into a decision
Pick the issue that could delay a signature, shipment, launch, or reopening. In a single paragraph, describe the asset or activity, the person with decision authority, the outstanding contract or insurance question, and the date you need an answer. For example, a lab might flag that a financed analyzer is arriving before the facility acceptance date and that responsibility during installation remains unresolved. The next step would be to compare the shipping contract, equipment contract, and insurance language against that timeline. Follow the related policy guides for detailed questions. Official FDA reference reviewed November 23, 2026.
Request a Montridge risk review when you have an agreement, renewal, or operational change that calls for a closer look. Start with the decision and its deadline. Business-level details are enough to identify the pieces that need review.

